We thank our photographer for capturing some shots that show how big and complex the site is from the inside. We've been told that Friday, September 5 marks a BIG CONCRETE pour that will see the about nine hours of concrete coming on our site and being installed for the roof of first floor/and ground of the second floor. When asked what will happen after that, we were told it's vertical walls on the second floor, the roof on that floor, and up to the third floor.
Keep coming back to the BLOG for updates and more photos.